Global EditionASIA 中文双语Français
China Daily Global / 2025-03 / 05 / Page014

Briefly

China Daily Global | Updated: 2025-03-05 00:00
Share
Share - WeChat

Tunnel work completed on Jinhua-Jiande Rail

All 22 tunnel projects on the Jinhua-Jiande Railway have been completed as the 6.1-kilometer Chayeping Tunnel — the line's longest — was bored through on Tuesday. The 64.5-km railway, with a maximum operating speed of 250 kilometers per hour, will link Jinhua and Jiande, both in Zhejiang province, integrating the region full of major attractions into major rail networks, said China Railway 24th Bureau Group Corp, a State builder participating in the railway's construction.

Yuan strengthens against greenback

The central parity rate of the Chinese currency renminbi, or the yuan, strengthened 6 pips to 7.1739 against the US dollar on Tuesday, according to the China Foreign Exchange Trade System.

Xinhua - China Daily

Most Viewed

Top
BACK TO THE TOP
English
Copyright 1995 - 2025. All rights reserved. The content (including but not limited to text, photo, multimedia information, etc) published in this site belongs to China Daily Information Co (CDIC). Without written authorization from CDIC, such content shall not be republished or used in any form. Note: Browsers with 1024*768 or higher resolution are suggested for this site.
License for publishing multimedia online 0108263

Registration Number: 130349
FOLLOW US